40 t/h evaporation plant put into operation
In September 2023, we were able to finally commission a new evaporation plant for wood-contaminated wastewater in South America.
Up to 40 t/h of process steam can be generated from the wastewater from fiberboard production and fed back into production.
![](https://www.schrader.de/wp-content/uploads/2023/09/Guararapes-2-768x1024.jpg)